How to maintain the slewing ring of the crane?
Check category

How to maintain the slewing ring of the crane?

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-06-12 01:24
  • Views:

(Summary description)When carrying out maintenance work, first of all, be aware of the danger of being dragged into the rotating pinion, the risk of crushing and shearing. When performing the following tasks, make sure that any maintenance workers are not in the danger zone between the main arm, the upper car and the reel, or between the disembarkation and the reel when starting the engine for the necessary revolving and luffing operations. In the danger zone, the crane operator (in the driver's cab) is excluded. Check the slewing bearing bolt 1. Before the crane works or at least once a week, visually inspect the bolts on the slewing ring; 2. After the slewing bearing works for 100 working hours for the first time, check whether the bolts are loose, and check again after the 300th working hour; Check every 500 working hours; shorten the inspection interval for bad conditions. If the bolt is loose during the inspection, please stop the construction work and immediately contact the local after-sales service department. The factory or professional technicians will make an inspection and decide whether to disassemble and inspect it immediately. 3. The slewing bearing is filled with lithium before installation. Base grease; 4, when replacing the bolt, wipe the bolt clean, apply screw fastening glue and tighten; use the crane according to the operation manual and lifting performance table, or check the fastening bolt regularly according to requirements, you can avoid The danger of bolt fatigue damage. Routine inspection of slewing bearings 1. Regularly check the flexibility of the rotation; if noise or impact is found, stop the inspection immediately, eliminate the fault, and dismantle the inspection if necessary; 2. Regularly check whether the rotating ring gear has cracks or breakage, and whether the meshing tooth surface has any bite, cut, or tooth surface peeling; 3. Regularly check the integrity of the seal. If the seal is damaged, it should be replaced in time. If it is found to fall off, it should be reset in time. Lubricate the tooth surface of the slewing ring The slewing ring gear is coated with anti-rust oil before leaving the factory. The anti-rust effective period is generally 3 to 6 months. After the expiration date, the anti-rust oil should be applied in time. In addition, in use, the slewing ring is protected from direct sunlight exposure. It is forbidden to directly flush the slewing bearing with water to prevent it from entering the raceway, so as to prevent the hard foreign matter from approaching or entering the tooth meshing zone. Lubricate the raceway of the slewing ring The raceway must be filled with grease regularly according to the working environment. After the first working 50 working hours, the raceway should be filled with grease and then injected once every 300 working hours. The slewing ring must be filled with grease before and after prolonged placement. If you use a steam jet cleaner or a fixed sprinkler to clean the crane, care must be taken to ensure that water does not penetrate the slewing ring connection and then the slewing ring connection must be lubricated. Special working conditions, such as tropical, high humidity, high dust, large temperature changes, and continuous operation, should shorten the lubrication cycle. Filling grease should be carried out with the slewing ring rotating slowly. When the grease overflows from the seal, the filling is completed, and the spilled grease will form a film to seal.

How to maintain the slewing ring of the crane?

(Summary description)When carrying out maintenance work, first of all, be aware of the danger of being dragged into the rotating pinion, the risk of crushing and shearing. When performing the following tasks, make sure that any maintenance workers are not in the danger zone between the main arm, the upper car and the reel, or between the disembarkation and the reel when starting the engine for the necessary revolving and luffing operations. In the danger zone, the crane operator (in the driver's cab) is excluded.

Check the slewing bearing bolt
1. Before the crane works or at least once a week, visually inspect the bolts on the slewing ring; 2. After the slewing bearing works for 100 working hours for the first time, check whether the bolts are loose, and check again after the 300th working hour; Check every 500 working hours; shorten the inspection interval for bad conditions. If the bolt is loose during the inspection, please stop the construction work and immediately contact the local after-sales service department. The factory or professional technicians will make an inspection and decide whether to disassemble and inspect it immediately. 3. The slewing bearing is filled with lithium before installation. Base grease; 4, when replacing the bolt, wipe the bolt clean, apply screw fastening glue and tighten; use the crane according to the operation manual and lifting performance table, or check the fastening bolt regularly according to requirements, you can avoid The danger of bolt fatigue damage.

Routine inspection of slewing bearings
1. Regularly check the flexibility of the rotation; if noise or impact is found, stop the inspection immediately, eliminate the fault, and dismantle the inspection if necessary;
2. Regularly check whether the rotating ring gear has cracks or breakage, and whether the meshing tooth surface has any bite, cut, or tooth surface peeling;
3. Regularly check the integrity of the seal. If the seal is damaged, it should be replaced in time. If it is found to fall off, it should be reset in time.

Lubricate the tooth surface of the slewing ring
The slewing ring gear is coated with anti-rust oil before leaving the factory. The anti-rust effective period is generally 3 to 6 months. After the expiration date, the anti-rust oil should be applied in time. In addition, in use, the slewing ring is protected from direct sunlight exposure. It is forbidden to directly flush the slewing bearing with water to prevent it from entering the raceway, so as to prevent the hard foreign matter from approaching or entering the tooth meshing zone.

Lubricate the raceway of the slewing ring
The raceway must be filled with grease regularly according to the working environment. After the first working 50 working hours, the raceway should be filled with grease and then injected once every 300 working hours. The slewing ring must be filled with grease before and after prolonged placement.
If you use a steam jet cleaner or a fixed sprinkler to clean the crane, care must be taken to ensure that water does not penetrate the slewing ring connection and then the slewing ring connection must be lubricated. Special working conditions, such as tropical, high humidity, high dust, large temperature changes, and continuous operation, should shorten the lubrication cycle.
Filling grease should be carried out with the slewing ring rotating slowly. When the grease overflows from the seal, the filling is completed, and the spilled grease will form a film to seal.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-06-12 01:24
  • Views:
Information
When carrying out maintenance work, first of all, be aware of the danger of being dragged into the rotating pinion, the risk of crushing and shearing. When performing the following tasks, make sure that any maintenance workers are not in the danger zone between the main arm, the upper car and the reel, or between the disembarkation and the reel when starting the engine for the necessary revolving and luffing operations. In the danger zone, the crane operator (in the driver's cab) is excluded.
 
Check the slewing bearing bolt
1. Before the crane works or at least once a week, visually inspect the bolts on the slewing ring; 2. After the slewing bearing works for 100 working hours for the first time, check whether the bolts are loose, and check again after the 300th working hour; Check every 500 working hours; shorten the inspection interval for bad conditions. If the bolt is loose during the inspection, please stop the construction work and immediately contact the local after-sales service department. The factory or professional technicians will make an inspection and decide whether to disassemble and inspect it immediately. 3. The slewing bearing is filled with lithium before installation. Base grease; 4, when replacing the bolt, wipe the bolt clean, apply screw fastening glue and tighten; use the crane according to the operation manual and lifting performance table, or check the fastening bolt regularly according to requirements, you can avoid The danger of bolt fatigue damage.
 
Routine inspection of slewing bearings
1. Regularly check the flexibility of the rotation; if noise or impact is found, stop the inspection immediately, eliminate the fault, and dismantle the inspection if necessary;
2. Regularly check whether the rotating ring gear has cracks or breakage, and whether the meshing tooth surface has any bite, cut, or tooth surface peeling;
3. Regularly check the integrity of the seal. If the seal is damaged, it should be replaced in time. If it is found to fall off, it should be reset in time.
 
Lubricate the tooth surface of the slewing ring
The slewing ring gear is coated with anti-rust oil before leaving the factory. The anti-rust effective period is generally 3 to 6 months. After the expiration date, the anti-rust oil should be applied in time. In addition, in use, the slewing ring is protected from direct sunlight exposure. It is forbidden to directly flush the slewing bearing with water to prevent it from entering the raceway, so as to prevent the hard foreign matter from approaching or entering the tooth meshing zone.
 
Lubricate the raceway of the slewing ring
The raceway must be filled with grease regularly according to the working environment. After the first working 50 working hours, the raceway should be filled with grease and then injected once every 300 working hours. The slewing ring must be filled with grease before and after prolonged placement.
If you use a steam jet cleaner or a fixed sprinkler to clean the crane, care must be taken to ensure that water does not penetrate the slewing ring connection and then the slewing ring connection must be lubricated. Special working conditions, such as tropical, high humidity, high dust, large temperature changes, and continuous operation, should shorten the lubrication cycle.
Filling grease should be carried out with the slewing ring rotating slowly. When the grease overflows from the seal, the filling is completed, and the spilled grease will form a film to seal.

Scan the QR code to read on your phone

Welcome to Yantai Haoyang Machinery Co., Ltd.

Yantai Haoyang Machinery Co., Ltd.

Address: No. 445-1, Jincheng Road, Zhaoyuan, Shandong Province
Business Tel:
+86-535-8248058
E-mail:sales@hyslewingbearing.com
Business Fax:+86-535-8248058

After-sales Service:+86-18865642818
E-mail:service@hyslewingbearing.com

Yantai Tiancheng Machinery Co., Ltd.
Add:No.1 Liuzihe Rd., Economic & Technological Development Area of Yantai, Shandong, China
Business Tel:
+86-535-2166078
E-mail:salestc@hyslewingbearing.com

After-sales Service:+86-535-2166078
E-mail:servicetc@hyslewingbearing.com

版權

Time of issue:2019-05-21 00:00:00

 Copyright ? 2019 Yantai Haoyang Machinery Co., Ltd.   魯ICP備05047462號    Powered by:www.300.cn   Manager

浙江11选5推荐号码 pc蛋蛋是什么网站 百家乐大路小路_Welcome 香港惠泽社群精准资料一肖中特 湖北30选5彩票开奖 北京11选5开奖号码查询今天晚上 ds视讯真假 极速时时彩彩开奖网站 内蒙古快3今天的预测 广东11选5过滤软件 ds视讯推荐hy158 澳洲幸运8开奖网记录 博定宝彩票官方网站-Welcome 亮剑总进球 上海天天彩选4历史开奖号码查询 hi彩分分彩开奖记录 亿客隆